‘Emergency, Urgent breakdown’ was the phone call we received. The customers machine was still needed to run but their component was failing. We were called to site and given 30 minutes of down time to measure this cock valve. Straight back to the work shop, fire up the Hurco VM20i to machine the actetal body within hygenic tolerances.
The end stub shaft and actuator quadrant was manufactured from 316 stainless steel. The whole job was returned to site within 24 hrs in time for their next maintenance shut.